• / 34
  • 下载费用:20 金币  

严雪梅施工方案

关 键 词:
严雪梅 施工 方案
资源描述:
严雪梅施工方案骋望丽都华庭小区室外给水 施工组织方案 班级:11秋建筑施工与管理 学号: 1132101451034 姓名: 严雪梅 任课教师: 南京江宁水务集团有限公司建筑安装公司 2011年8月17日 people. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installation in all curtain wall installation process due to its large amount of inconvenience of construction, high precision and play a very important role. If mullion is installed, the entire scheduleselect key, critical layer to clean, prevent debris impact on Ravel, identify key points and key layer fixed reinforced this point, and use on this level to take level so that horizontal lines as needed. (5) according to the curtain wall construction, simple key levels are not sufficient to determine the vertical position, in order to ensure the error limits of vertical installation, put the line ... Personnel 一、编制说明和工程概况 1(1编制说明 1(1(1本施工组织方案编制依据: (1)南京广元市政设计有限公司设计上骋望丽都华庭小区室外给水施工图(图号:S11-065) (2)国家及各级政府和部门的有关政策、法规、规章及政策文件。 (3)建设单位提供的其他有关资料。 1(1(2编制本施工方案采用的主要规范: (1)《建设工程项目管理规范》(GB/T50326-2001); (2)《给水排水管道工程施工及验收规范》(GB50268-97); (3)《混凝土结构工程施工及验收规范》(GB50202-2002); (4)《建筑施工安全检查标准》(JGJ/T107-96); (5)《普通混凝土用砂质量标准及检验方法》(JGJ107-92); (6)《现场设备、工业管道焊接工程施工及验收规范》(GB50236-98); (7)《建筑给水排水及采暖工程施工质量验收规范》(GB50242-2002)。 8)《给水排水构筑物施工及验收规范》(GBJ141-90) (1(2 工程概况 1(2(1 工程性质 建设单位:南京骋望置业有限公司 监理单位: 工程名称:骋望丽都华庭小区室外给水 设计单位:南京广元市政设计有限公司 施工单位:南京江宁水务集团有限公司建安公司 工程地点:江宁大学城宏景大道以东学十二路以北 1(2(2工程概况 (1)本工程为骋望丽都华庭小区室外给水安装项目,管道直径DN300-100;长约1300M。 (2)承包方式:包工包料,一次性大包干。 (3)要求质量标准:符合国家验评标准(合格)。 (4)要求工期:配合甲方土建进度。 二、施工部署 2(1施工部署原则:针对性、可行性、先进性、可靠性 1.针对性 充分考虑本工程特点、重点、难点及各种不可预见因素,制定与之相应的各种行之有效措施,确保既定目标的实现。 2ition, in order to ensure the error limits of vertical installation, put the line ... Personnelal poslines as needed. (5) according to the curtain wall construction, simple key levels are not sufficient to determine the verticRavel, identify key points and key layer fixed reinforced this point, and use on this level to take level so that horizontal ct on y a very important role. If mullion is installed, the entire scheduleselect key, critical layer to clean, prevent debris impaion in all curtain wall installation process due to its large amount of inconvenience of construction, high precision and plapeople. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installat 2.可行性 采取切实可行的施工技术措施,必要处准备多项措施,在情况发生变化时,可采取不同施工方法,避免被动。 3.先进性 充分利用工业化、机械化的施工方法,提高施工效率及施工质量。充分利用科学化、信息化的现代工程管理手段,加强施工计划的准确性、及时性。 4.可靠性 运用的技术措施必须是经过理论论证、经过实践验证的可靠技术,对施工过程全要素控制及调整,使信息及资源始终处于受控状态,确保计划的实施。 2(2施工程序 本工程从一期预留点进行施工,按先关键性工程施工,后抓构造工程施工,配套设施穿插进行的施工方法来部署。组织施工队以流水施工作业为主的作业布置,各分布工程配合好衔接施工,并分期分批组织打突击战,必要时集中合作,抢抓重点施工,以确保工程保质保量按期完工。 2(3工期目标 为确保工程尽早完成,组织优势资源,根据上述原则,考虑各方面不利因素及 有利因素的影响。 (1)根据甲乙双方商议及施工现场的实际情况,确定正常情况下的最乐观工期。 (2)因不可抗力导致工期延误不在计算范围内。 本工程拟于2011 年 月 日开工,配合甲方土建进度按期竣工。 2(4施工准备 2(4(1提前做好技术和现场各项施工准备工作,把工程所需要的材料、机械设备、劳动力调入本工程,是决定本工程能够顺利保质保量按计划完成的第一步。 图纸会审、技术交底 组织施工队伍进场 编制施工预算及施工方案 施 工做好临时工程及场内总布置 单 位 落实运输计划及材料设备堆放 按本公司的ISO-9001质量标准体系,落实合格的 供应商,组织材料进场 开工报告 施工设备进场、调试 3the error limits of vertical installation, put the line ... Personnelsure ing to the curtain wall construction, simple key levels are not sufficient to determine the vertical position, in order to enand key layer fixed reinforced this point, and use on this level to take level so that horizontal lines as needed. (5) accord pointsf mullion is installed, the entire scheduleselect key, critical layer to clean, prevent debris impact on Ravel, identify key stallation process due to its large amount of inconvenience of construction, high precision and play a very important role. Iin all curtain wall in people. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installation 2(4(2 开工前技术负责人组织施工技术人员、专职质检人员、项目负责人及民工队长、项目组长至操作工进行图纸会审及技术交底工作,使参加施工的人员熟悉施工规范、操作规程。熟悉、掌握设计要求及施工组织设计要求。编制详细的材料计划,施工任务单等。做好技术质量要求及安全技术交底,必要时对特殊专业操作人员进行培训。 根据设计要求及施工总平面布置要求做好测量控制工作,测设测量控制网点,对工程进行定位放线工作。 2(4(3根据本工程特点及时上报材料计划,以便总公司综合计划科及时组织各类材料的进场和成品、半成品的订货。 2(4(4落实调动工程所需的模板、钢筋、管道等材料进场,调动工作所需的机械设备进场。 2(5施工组织 为确保该工程能按优质规范的要求施工,我公司本着精心组织、精心施工、机构精简、工作效率提高的原则组建南京江宁区自来水总公司建筑安装工程分公司骋望丽都华庭小区室外工程施工项目经理部,确保本工程质量达到“合格”标准。 项目经理部由项目经理、技术负责人、民工队长、项目组长、后勤人员组成。项目经理对工程施工进度、质量、安全生产、文明施工等全面负责,各部门在项目经理的领导下密切配合,明确分工,共同按计划完成施工任务。项目经理部负责解决材料、机械设备、劳动力调配,扫除技术障碍及加强各部门各单位的协调工作,负责技术资料的收发,整理归档。 技术负责人具体负责施工技术管理工作,编制各项目工程和零星工程的施工方案,负责实施施工过程控制。统一管理技术档案资料以及技术情报、标准规范。包括收集、整理、保管、借调和利用工作。所有施工的部门均有责任收集、整理与本职工作有关的档案资料并及时移交归档。 质检、安全员具体负责质量管理工作、质量监督及安全生产工作 (质检人员持质检员上岗证上岗),抓好全面质量管理。材料供应部门对工地的物资供应统一管理,机具材料等堆放合理,做好标识(按本公司ISO-9001质量体系文件, NS/QP-10产品标识和可追溯性程序执行),不得混堆乱放。做到收发、存资料齐全。 各民工队在项目经理部的领导下,要个负其责。认真努力完成各自的施工任务。各施工作业队明确分工、责任到人、分工不分家相互竞赛。必要时集中合作分期分批打突击战,抢抓重点施工,以确保工程保质保量按期完工。 附:施工组织机构图 4ition, in order to ensure the error limits of vertical installation, put the line ... Personnelal poslines as needed. (5) according to the curtain wall construction, simple key levels are not sufficient to determine the verticRavel, identify key points and key layer fixed reinforced this point, and use on this level to take level so that horizontal ct on y a very important role. If mullion is installed, the entire scheduleselect key, critical layer to clean, prevent debris impaion in all curtain wall installation process due to its large amount of inconvenience of construction, high precision and plapeople. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installat 项目经理 工工工工工工 地程程程程程负技施质安材责术工检全料人员员员员员 施工班组 三、施工总平面布置图 3(1临时设施布置 租用民房一处,由民工队办理相关租赁手续,或搭设临时帐篷一处,集中堆放零碎配件及辅材。 (2施工用水、电、讯 3施工用水:施工用水,接当地自来水。 施工用电:(1)我司将根据施工现场的具体条件,搭建临时用电设施,施工部门负责对接入工地的临时配电间和配电设施的安装、架设、管理和维护等;(2)为确保工程质量及施工正常、防止不可避免的停电给工程质量、进度带来危害,现场拟考虑配置45KW柴油发电机组一台,以保证施工不间断进行。 施工通讯:现场管理人员用移动电话联系。 3(3场内外交通 场外交通公路直至工地;场内交通,工程开工时拟在要修筑的便道位置开挖,填筑、辅设碎石并压实,作为通向工地的临时现场道路,路两侧设排水沟。 3(4施工现场平面图 (见后附总平面图) 四、施工需求量计划 4(1劳动力需求量要量计划 劳动力数量配置是在确保工程进度的前提下,力求相对平稳合理,有利于施工管理。我单位拟安排在本工程的劳动力配备见劳动力计划表。 5the error limits of vertical installation, put the line ... Personnelsure ing to the curtain wall construction, simple key levels are not sufficient to determine the vertical position, in order to enand key layer fixed reinforced this point, and use on this level to take level so that horizontal lines as needed. (5) accord pointsf mullion is installed, the entire scheduleselect key, critical layer to clean, prevent debris impact on Ravel, identify key stallation process due to its large amount of inconvenience of construction, high precision and play a very important role. Iin all curtain wall in people. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installation 劳动力计划表 工 种 人数 水 工(带常用工具) 1 民 工(带常用工具) 6 瓦 工(带常用工具) 2 电 工(带常用工具) 1 机械工(带常用工具) 3 合 计 13 4(2施工机具进场计划表 拟投入本合同工作的主要施工设备表: 拟投入本合同工作的主要施工设备表 设备名称 使用台数 10T手拉钢丝葫芦 4台 依维柯工具车 1辆 25T汽车吊机 1辆 砂轮切割机 2台 75KW空压机 1台 D型试压泵 1台 1.2M3履带挖机 1台 BX-500电焊机 2台 325+116电缆线 200米 临时照明工具 2套 配电柜 1台 氧气、乙炔设备 2套 45KW柴油发电机 1套 1.5KW热熔器 2台 五、主要施工方法及技术质量保证措施 5(1施工程序 工程项目不是单独的一项一项地完成,而是按照“先下后上”、“先主后次”的原则,次要项目服从主要项目穿插着进行施工。以组织流水施工为主的作业布置,抓好各分项工程的配合衔接施工,分期分批组织突击施工,抢抓重点,确保工程按计划完工。 5(2施工测量 5(2(1准备工作 6ition, in order to ensure the error limits of vertical installation, put the line ... Personnelal poslines as needed. (5) according to the curtain wall construction, simple key levels are not sufficient to determine the verticRavel, identify key points and key layer fixed reinforced this point, and use on this level to take level so that horizontal ct on y a very important role. If mullion is installed, the entire scheduleselect key, critical layer to clean, prevent debris impaion in all curtain wall installation process due to its large amount of inconvenience of construction, high precision and plapeople. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installat 1、项目经理会同本部技术人员在工程测量放样之前,应将用于本工程施测的各种测量仪量、测量工具送计量部门检测、校正、符合要求方准进入现场使用。 测量仪器配备及数量:水准仪1台、标尺1把、50M玻璃纤维卷尺1把、其它测量工具若干。 、项目经理在收到总公司技术科提供的施工图纸和施工范围内平面控制点和高2程控制点的基本数据后,首先对提供的基础线进行复测验算,在确认数据准确无误后方可进行施测放样,否则需以书面形式上报总公司技术科核查情况,经总公司技术科核实后的数据,以书面材料下发后方可使用。 3、选择测放方法:在熟悉现场的基础上布置平面控制网,绘制测放图,将工程施工的位置控制点标注于图中,同时将测放方案上报总公司技术科。在技术科提供的控制点上加密控制点,应布置在通视不易破坏的位置,且边长比不大于1:3以减小误差,同时控制应有醒目标志。 5(2(2测量(放样) l、做好放样前的准备工作,工具、材料、仪器准备齐全,所需施工测点的数据需事先进行内业计算。 2、以场内布设导线控制点为测站,用极坐标法施工放测点,测定后需进行校核,其精度相对于基本控制点允许误差?30mm-50mm。 5(2(3高程控制测量 1、控制高程的测量:依据总公司技术科提供的场内导线控制点高程,对加密布置的场内导线控制点作闭合测量,按五等水准要求测量。 2、每测站及时计算误差及前后视距,当满足要求后方可进行下一站测量。 3、外业测量完毕进行闭合计算,合格后方可进行平差计算,汇成成果表总公司技术科复测审核,否则重测。 4、所有测量记录应按规范填写,不得随意涂改。 5(3土方开挖、回填 5(3(1沟槽土方开挖 土方回填土方开挖采用人机结合,机械开挖为主,人工开挖为辅。在开挖前,应根据图纸“沟槽回填土分区示意图”进行放样,对高于设计标高的地方,用反铲挖掘机进行开挖,开挖出的杂土全部用自卸车外运,开挖出的粘土在不影响工程施工的情况下,保留作为回填土就近堆放,当挖至设计断面以上20厘米时用人工进行开挖以防止超挖,如在设计断面仍有杂质土,必须全面清除干净,然后用粘土分层夯实,对坡面低于设计标高的地方,应将工程范围内的建筑物全部拆除,杂草也必须清除。对于反铲挖掘机无法进行作业的地段,我们将采用人工开挖。 土方开挖注意要点:开挖前放好基坑开挖断面尺寸,用石灰撒出开挖标志线。开挖至设计断面前要随挖机不断测量,以保证不超挖也不欠挖。 7the error limits of vertical installation, put the line ... Personnelsure ing to the curtain wall construction, simple key levels are not sufficient to determine the vertical position, in order to enand key layer fixed reinforced this point, and use on this level to take level so that horizontal lines as needed. (5) accord pointsf mullion is installed, the entire scheduleselect key, critical layer to clean, prevent debris impact on Ravel, identify key stallation process due to its large amount of inconvenience of construction, high precision and play a very important role. Iin all curtain wall in people. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installation 5(3(2土方回填 沟槽复土应在管道隐蔽工程验收合格后进行。沟槽复土应及时,防止管道暴露时间过长造成损失。 沟槽复土应该遵循以下规定: )管顶30cm范围内,必须用人工回填,严禁机械推土回填。 12)回填先从管底与基础结合部位开始,沿管胸腔两侧同时对称分层回填并夯实,每层回填高度不超过20cm,直至管顶以 上30cm。回填材料质量应符合设计要求。 3)若采用推土机或碾压机械碾压,管顶以上的复土厚度不应小于70cm. 4)胸腔回填土压实度 在道面下:98% 在端安全道土面区:95% 在其它土面区:95% 5)沟(管)顶以上的回填土,在紧靠沟(管)顶上面50cm深度内,为了不使压实机械损坏沟(管),可分为薄层用人工夯实到规定密实度。 6)对于过路管道回填均采取C30混凝土包封。 雨季填筑时,密切注意天气变化。雨前将填筑作业面铺成中间微拱形,及时碾压防止雨水渗入土中,防止表面积水。降雨时停止铺土作业,并采取措施,做好保护工作。下雨后做好填筑面的保护工作,严禁车辆行走破坏工作面,待填筑面经晾晒后视现场情况做好复压处理,然后再进行复工填筑上一层土层。 5(3(3质量检测标准 (1)土方开挖:标高误差-50mm,长度、宽度误差-50,+200mm,表面平整度误差20mm。 (2)填土:标高误差-50mm,表面平整度误差20mm。 5(4施工降排水 施工降排水工作是施工中重要的一环,直接影响土方开挖、土方填筑及整个工程和施工的质量。建立合理的降排水系统,对加快工程进度,保证工程质量十分重要。 为解决施工区内积水、渗水的排除在开挖区周边或边坡上设截水沟、修筑截水埂等措施防止场外水流汇入施工区,并有效地排除。 5(5混凝土工程 本分部项工程主要执行《混凝土结构工程施工及验收规范》(GB50202-2002),《普通混凝土用砂质量标准及检验方法》(JGJ107-92)等相关规定。 5(5(1模板: 采用定型组合钢模板现场就位组装及部分木质模板、高强度覆塑竹胶板,按模板图在现场加工拼装,钢木结合。 模板与砼接触面视模板情况分别涂刷专用脱模剂及隔离剂。模板安装后,经技8ition, in order to ensure the error limits of vertical installation, put the line ... Personnelal poslines as needed. (5) according to the curtain wall construction, simple key levels are not sufficient to determine the verticRavel, identify key points and key layer fixed reinforced this point, and use on this level to take level so that horizontal ct on y a very important role. If mullion is installed, the entire scheduleselect key, critical layer to clean, prevent debris impaion in all curtain wall installation process due to its large amount of inconvenience of construction, high precision and plapeople. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installat 术人员对模板进行仔细、全面的检查。发现问题及时修整。模板及支架上严禁堆放超过其设计荷载的设备和材料。 在浇筑砼时,安排责任心较强的操作工负责观察检查模板支架。如发现模板变形和预埋件位移等异常情况时应立即采取有效的措施加回处埋。 模板拆除的时限,除符合设计规定外,还应遵守下列规定;非承重侧模板的拆除,应在砼强度达到其表面及棱角不因拆模而损伤时,方可拆除;墩、墙和柱部位在其强度不低于3(5mpa时方可拆除底模的拆除应在砼强度达到下列规定方可拆除。 5(5(2对原材料的要求 水泥:除出具出厂质保书外,还需取样作强度试验、凝结时间、稠度、细度、比重和安定性试验,其强度必须高出相应的出厂标号,安定性经煮沸法试验。 砂、石材料:碎石、中粗砂,含泥量不大于3,,并按规定做好试验工作。 配合比:根据砼的设计强度,通过试验、试配选定,施工现场设置计量台,派专人负责原材料的计量工作,搅拌砼严格按重量比配料,严格控制水灰比。 混凝土的浇筑:砼浇筑按每一单体件安排连续施工,分层分段,斜面分层地向前浇筑。砼养护派专人负责,砼拆模后随时用塑料薄膜包裹捆扎或草包覆盖,从顶上浇水养护使水顺膜内壁渗流,保持砼表面湿润,消减砼温度应力。 5(5(3质量检验标准 (1)混凝土的允许偏差为:轴线位置15mm,截面尺寸+8mm,5mm,表面平整8mm。 (2)混凝土抗压强度试验结果应达到设计混凝土强度等级。 5(6管道安装 5(6(1钢管的铺设 本分部项工程主要执行《现场设备、工业管道焊接工程施工及验收规范》(GB50236-98)等相关规定 本工程为给水压力球墨铸铁管安装工程,钢管部分焊接工作量不大,成品钢管每根6米,施工难度不大。 5(6(1(1钢管的铺设 (1)钢管放置,其纵向焊缝的位置,应力求避开最大受力点和管道下半部。 (2)钢管及管件在使用前,应进行外观检查,并核对出厂合格证。钢管表面应无显著锈蚀、无裂纹、重皮和压延不良现象,进场时应对钢管逐根量测、编号、配管,并做好标识,表面不得有超过壁厚偏差的凹陷、锈蚀及机械损伤。 5(6(1(2钢管焊接 (1)钢管外围周长允许差不得超过5毫米( (2)管子椭圆度不超过0.OlD,在管节的安装端部不得超过0.005D。 (3)管节组对时,中心线的偏差不得超过2mm,管节不直度每米不超过lmm。 9the error limits of vertical installation, put the line ... Personnelsure ing to the curtain wall construction, simple key levels are not sufficient to determine the vertical position, in order to enand key layer fixed reinforced this point, and use on this level to take level so that horizontal lines as needed. (5) accord pointsf mullion is installed, the entire scheduleselect key, critical layer to clean, prevent debris impact on Ravel, identify key stallation process due to its large amount of inconvenience of construction, high precision and play a very important role. Iin all curtain wall in people. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installation (4)管端接口间隙不应大于2mm,如超过应加入短管连接,禁止用强大的外力或加热使管壁拉长的办法缩小间隙。 (5)钢管组对前应将坡口及外表面不小于10-20cm范围的油漆垢、锈及毛刺等清除干净,不得有裂纹、夹层等缺陷。 (6)对口点焊焊缝长度一般为40-100mm,电焊间距不宜大于400mm。即每道口点焊数为8个。 (7)钢管现场安装采用手工电弧焊,“V”型外坡口,每焊完一层都用手砂轮清根处理,将气泡、夹渣、流坠等缺陷清除干净后,再焊下一层。 (8)为减少焊接变形和焊接应力,焊接时采用对称或分段等焊接方法,分段长度一般为200-400mm,应根据结构的特点和坡口的型式预留反变形或选择合理的焊接顺序。 (9)焊透的焊缝在焊背缝时,应用手砂轮将根部的焊瘤、焊渣和未焊透等缺陷清除干净。 (10)施焊焊工 遵照(GB50236—98)焊工考试规则进行考试,取得考试合格证,并遵照钢管焊接工艺规程规定进行施焊。 (6(1(3钢管焊缝质量检查 5(1)焊缝质量等级为工I工级。 (2)焊缝表面无裂纹,无气孔,无夹渣,无弧坑或焊疤。 (3)焊缝边缘咬边深度<0.5mm,咬边连续长度小于lOOmm,每道焊缝咬边的总长度(焊缝两侧之和)不得超过该焊缝长度的10% (4)焊缝表面加强高:e<1+0.2b,但最大为5mm。 (5)焊缝表面凹陷:深度el<0.5mm,长度小于或等于焊缝全长的10%,且小于100mm。 (6)焊缝接头坡口错位:e2
展开阅读全文
  麦档网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
0条评论

还可以输入200字符

暂无评论,赶快抢占沙发吧。

关于本文
本文标题:严雪梅施工方案
链接地址:https://www.maidoc.com/p-17204159.html
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2018-2020 maidoc.com版权所有  文库上传用户QQ群:3303921 

麦档网为“文档C2C模式”,即用户上传的文档所得金币直接给(下载)用户,本站只是中间服务平台,本站所有文档下载所得的金币归上传人(含作者)所有。
备案号:蜀ICP备17040478号-3  
川公网安备:51019002001290号 


收起
展开